Westconnex

The Rozelle Interchange and Iron Cove Link is the part of the M4-M5 Link and will provide a new underground motorway interchange to City West Link and provide an underground bypass of Victoria Road between Iron Cove Bridge and Anzac Bridge, with links to the future Western Harbour Tunnel. READ CASE STUDY Images sourced from […]

Botany Rail Duplication

The Botany Rail Duplication Project is an Australian Government initiative aimed at improving the capacity and reliability of the freight rail connection to Port Botany to enable more freight to be moved by rail. The project involves the duplication of a 2.9-kilometre section of single line freight track within the Botany Line rail corridor between […]

Pacific Highway Upgrade

Woolgoolga to Ballina is the final link in the Pacific Highway, between Hexham and the Queensland border, to be upgraded to four lanes. The project includes upgrading the highway to motorway (Class M) or arterial (Class A) standard over its 155 kilometre length, nine interchanges, more than 170 bridges and more than 350 connectivity structures. […]

Bundian Way Business Case

The Bundian is the best preserved of the ancient east–west Aboriginal routes of southeastern Australia. It stretches from the highest point on the Australian continent, Targangal (Mount Kosciuszko), to the sea at Bilgalera (Fisheries Beach) on Twofold Bay. READ CASE STUDY Images sourced from Visit NSW GOALS WolfPeak was engaged by the Eden Local Aboriginal […]

Sydney Light Rail

WolfPeak fulfilled the role of Environment and Planning Manager within the TfNSW Sydney Light Rail Delivery Office (SLRDO) Environmental team, providing environmental support and subject matter expertise to the TfNSW project team and wider Sydney Light Rail (SLR) Project. READ CASE STUDY GOALS WolfPeak was integral to the management and monitoring of environmental compliance during […]

Snowy 2.0

Snowy 2.0 will link the two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels and an underground power station with pumping capabilities. READ CASE STUDY Images sourced from Snowy Hydro Limited GOALS WolfPeak was engaged to develop environmental plans, programs and procedures that cover highly complex works within sensitive environments. The team developed […]

Strategic Tourism Analysis

DSNSW wanted to take a more strategic approach to investment in the development and support of tourism product in the DSNSW region. The region covers the south eastern portion of NSW and includes eight local government area. READ CASE STUDY GOALS WolfPeak was engaged with TRC tourism (a specialist tourism consultant) to improve DSNSWs strategic […]

Port Risk Assessment

Port Authority of New South Wales (Port Authority) manages the navigation, security and operational safety needs of commercial shipping and owns and manages ports in Sydney Harbour, Port Botany, Port Kembla and the ports of Newcastle, and Yamba.   READ CASE STUDY GOALS WolfPeak has been engaged to undertake an independent assessment of environmental and […]

Botany Industrial Park

The Botany Industrial Park (BIP) is an integrated  spanning 60ha and housing a range of chemical manufacturing facilities, remediation projects and logistics operations. READ CASE STUDY Images sourced from Botany Industrial Park GOALS Four primary companies control the BIP: Orica Australia (Groundwater Clean-up Project and HCB Repackaging Plant and Storages) Indorama Ventures Oxides Australia (surfactants […]

Inland Rail

The Australian Rail Track Corporation (ARTC) is delivering the 1700km Inland Rail Program, the largest freight rail infrastructure investment in Australia. The Program comprises 13 separate projects and, once completed, will allow double-stacked rail transport between Melbourne to Brisbane. READ CASE STUDY GOALS The Australian Rail Track Corporation (ARTC) are delivering the 1700km Inland Rail […]