Snowy 2.0

Snowy 2.0 will link the two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels and an underground power station with pumping capabilities.

Images sourced from Snowy Hydro Limited

WolfPeak was engaged to develop environmental plans, programs and procedures that cover highly complex works within sensitive environments. The team developed high quality documents within tight timeframes which allowed for the Department of Planning Industry and Environment to approve commencement of construction without delay and will facilitate positive environmental outcomes during the construction process.

WolfPeak have also provided ongoing environmental leadership and strategic advice throughout the construction phase.

Project

Snowy 2.0

client

Future Generation (Salini Impregilo, Clough and Lane Joint Venture)

ROLE

Environmental Consultant

value

$4.6 Billion

DATES

2019 to 2024

Our experience, insights and relationships mean we get the job done with a minimum of fuss.

 Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Bibendum est ultricies integer quis.

EIS management and technical review

Tender support

Environmental Management System (EMS)

Construction Environment Management Plan (CEMP)

Construction phase expertise

Independent Environmental Representative support