Botany Rail Duplication

The Botany Rail Duplication Project is an Australian Government initiative aimed at improving the capacity and reliability of the freight rail connection to Port Botany to enable more freight to be moved by rail. The project involves the duplication of a 2.9-kilometre section of single line freight track within the Botany Line rail corridor between […]

Snowy 2.0

Snowy 2.0 will link the two existing Snowy Scheme dams, Tantangara and Talbingo, through underground tunnels and an underground power station with pumping capabilities. READ CASE STUDY Images sourced from Snowy Hydro Limited GOALS WolfPeak was engaged to develop environmental plans, programs and procedures that cover highly complex works within sensitive environments. The team developed […]

Botany Industrial Park

The Botany Industrial Park (BIP) is an integrated  spanning 60ha and housing a range of chemical manufacturing facilities, remediation projects and logistics operations. READ CASE STUDY Images sourced from Botany Industrial Park GOALS Four primary companies control the BIP: Orica Australia (Groundwater Clean-up Project and HCB Repackaging Plant and Storages) Indorama Ventures Oxides Australia (surfactants […]

Inland Rail

The Australian Rail Track Corporation (ARTC) is delivering the 1700km Inland Rail Program, the largest freight rail infrastructure investment in Australia. The Program comprises 13 separate projects and, once completed, will allow double-stacked rail transport between Melbourne to Brisbane. READ CASE STUDY GOALS The Australian Rail Track Corporation (ARTC) are delivering the 1700km Inland Rail […]

Schools Infrastructure

The School Infrastructure program of works includes the 190 new and upgraded schools to support communities across NSW. WolfPeak have been engaged as the Independent Auditors for more than a dozen State Significant Developments. The Projects will enable the new schools to accommodate over 7,000 students. READ CASE STUDY Images sourced from Schools Infrastructure NSW […]

Inland Rail CEMP Templates and Guidance

ARTC Inland Rail is responsible for the construction of the inland rail freight line connecting Brisbane and Melbourne. The NSW segment of the project has been divided into seven separate work packages which will all be approved and constructed at different times. Each package could be won by a different construction contractor. This opens up […]